FEATUREDOIL AND GAS

Sulzer supplies water injection pumps for new FPSO

The new Parque das Baleias (Whale Park) floating production, storage and offloading (FPSO) vessel which is heading to Brazil will be equipped with Sulzer water injection pumps.

Image Source: Shutterstock 1153608196.

Sulzer will supply four packaged pump sets, which include a 9.7 MW motor, the 8-stage HPcp pump and all the auxiliary equipment required for the challenging offshore environment.

Due to be located 77 km offshore from Espirito Santo, Brazil, the Whale Park FPSO will operate in 1,400 m deep waters, processing 100,000 barrels of oil and 5 million cubic metres of natural gas per day. First oil on deck is targeted by 2024.

Sulzer has a long-standing relationship with the engineering procurement and construction (EPC) company involved in the project.

Related posts

IPR OVERHAULS PUMP FOR CUSTOMER IN MANUFACTURING SECTOR

Mthokozisi

Less waste means more reliability

Mthokozisi

Libya shuts down oil distribution valve in protest against captivity of Central Security Chief

Collen Geza

Leave a Comment